Back to all articles
How Long Does Cork Rendering Take?

Typical timeframe
Most cork rendering projects are completed within three to seven days, depending on the size and condition of the property.
What impacts timing
The duration of the project depends on the size of the property, the level of preparation required and weather conditions during application.
Process overview
The process typically includes surface preparation, any necessary repairs, application of the cork coating and final finishing.
